Week 8
Steel beams are installed.
Temporary walls have been installed inside to hold up the second floor while the new steel beams are installed. There is one long beam installed front to back under the second floor exterior wall. Then they've installed a pair of beams going sideways, under the front-to-back beam. These beams extend further out and land on the new exterior wall below.
Week 7
Windows ordered!
This was a complicated order as we had a multitude of different conditions including varying wall thicknesses, hardware configurations, and window types. Several of the new windows are French style to match the existing original windows removed. These casement pairs have no center stile or post between them when open. They will also come with push-out hardware rather than the typical cranks. Although all the new windows are aluminum clad rather than painted, the exterior trim and sills will be very similar to the old windows, including extended horns (the portion of the sill extending sideways beyond the trim).