Los Altos remodel and addition

First of all, we need a new larger job site sign.... 

The existing entry and stair after finishes removed.

The existing entry and stair after finishes removed.

The project is a whole house redo inside, replacing all windows and exterior doors, and a small exercise room addition on the second floor.

The project is a whole house redo inside, replacing all windows and exterior doors, and a small exercise room addition on the second floor.

A kitchen remodel

On any job, there are always unanticipated surprises. Lately contractors are discovering what used to be relatively simple and fairly fast to have handled is turning into a bureaucratic mess with PG&E. For this project with a small addition, we had to have PG&E move a gas meter about 7 ft closer to the street. Didn't happen in the normal timely manner.

Once the meter was moved, they were allowed to sheet rock. Here's the new opened up space, waiting for Kitchen & Family Room cabinetry.