Temporary walls have been installed inside to hold up the second floor while the new steel beams are installed. There is one long beam installed front to back under the second floor exterior wall. Then they've installed a pair of beams going sideways, under the front-to-back beam. These beams extend further out and land on the new exterior wall below.