The exterior shingles are going on.

2013-03-05 11.12.21.jpg
​The drywell for the roof drainage system.

​The drywell for the roof drainage system.

The folding door system coming from the new Family Room.​

The folding door system coming from the new Family Room.​

2013-03-11 13.34.02.jpg
2013-03-11 13.29.44.jpg
2013-03-11 13.29.56.jpg
2013-03-11 13.30.15.jpg
2013-03-11 13.31.03.jpg
2013-03-11 13.30.50.jpg