Week 19/20

The exterior shingles are going on.

2013-03-05 11.12.21.jpg
The drywell for the roof drainage system.

The drywell for the roof drainage system.

The folding door system coming from the new Family Room.

The folding door system coming from the new Family Room.

2013-03-11 13.34.02.jpg
2013-03-11 13.29.44.jpg
2013-03-11 13.29.56.jpg
2013-03-11 13.30.15.jpg
2013-03-11 13.31.03.jpg
2013-03-11 13.30.50.jpg